Build Project

With the material ready to be installed a Perihelion Solar work crew member(s) will come to the site to outline on ground or rooftop projects the location of the array. Once the location is appealing to
the customer construction will begin. Generally, installations take one to two weeks depending on the size of the system and weather conditions.

Let Perihelion Solar Power Your Home!

Power Your Home with Beautiful Solar

Stay Connected with Us!

Galifrey© 2020. All Rights Reserved.